Group Eleven Resources Corp.
Group Eleven Resources Corp. is a TSX Venture copper explorer with 4 drilling campaigns on our Drill & Assay board: 2 drilling, 0 with results due, 2 planned and 0 finished. Its latest news release with drilling facts came out on 17 Nov 2026. Below: every drilling campaign the company has announced, where each stands today, each fact quoted from the company’s own news release.
Group Eleven Resources Corp. share price
The close at the top of this page is the TSX Venture closing price from our own nightly price record.
On today’s TSX/V boards
Reading today’s boards…
No investor presentation found on the company’s website.
Drilling campaigns
| # | Campaign | Status | Latest fact | Updated |
|---|---|---|---|---|
| 01 | most ambitious drill campaign to date PG West Project · 2027 · diamond | Drilling | 98 holes drilled · 35,402 m drilled · about 67,000 m planned · 5 rigs “First announced in Sept-2022, the discovery has 98 holes drilled and reported by Group Eleven to date, including today's results from seven new holes (26-2654-05 to -07; 26-468-28, 26-3552-62, -63 and -64).” news release | 17 Nov 2026 |
| 02 | current program Stonepark Project | Drilling | 3 holes drilled · 2,700 m planned · 4 holes planned · 1 rig “Drilling at the Stonepark project (77.64% interest), adjacent to PG West, continues with three holes completed and one hole to be finished in a few weeks, as part of the current program (see news release dated 16-Apr-2026).” news release | 14 Oct 2026 |
| 03 | follow up drilling PG West Project | Planned | planned “26-468-25 – First ever hole drilled at gravity 'Anomaly A' (approx. 2km to the SW of the currently outlined discovery limits), returned multiple intervals, intermittently throughout the hole, of trace malachite, chalcopyrite, suspected tennantite-tetrahedrite, sphalerite and galena, plus steeply south-dipping faults, suggesting the presence of a mineralizing system much further SW than previously known; above results are highly encouraging; follow up drilling planned in near term” news release | 20 Aug 2026 |
| 04 | larger (12,800m) drill campaign Stonepark Project | Planned | 12,800 m planned “Subject to board approval, follow up drilling is likely to be conducted here as part of the larger (12,800m) drill campaign, expected to start in late 2026 or early 2027, while still primarily targeting the 'mirror-image' of Glencore's Pallas Green zinc-lead deposit 2 on the south side of the Limerick Volcanic Complex.” news release | 23 Jul 2026 |
AnalyzeOre
AnalyzeOre reads a drilling or assay news release and shows what it says, what it leaves out, and the words each fact came from. It uses the release text on TMX Money, or the company’s own PDF, and links to the release; it does not copy it.
- 17 Nov 2026First announced in Sept-2022, the discovery has 98 holes drilled and reported by Group Eleven to date, includi…
- 10 Nov 2026First announced in Sept-2022, the discovery has 91 holes drilled (totalling 35,402m) and reported by Group Ele…
- 14 Oct 2026The Company is fully funded for its ongoing drill campaign, totalling approx. 67,000m, started in April 2026 a…
- 20 Aug 202626-468-25 – First ever hole drilled at gravity 'Anomaly A' (approx. 2km to the SW of the currently outlined di…
- 23 Jul 2026In the interim, we look forward to completing the current 2,700m drill campaign at Stonepark over the coming m…
Recent news releases
| Date | Fact quoted |
|---|---|
| 17 Nov 2026 | “First announced in Sept-2022, the discovery has 98 holes drilled and reported by Group Eleven to date, including today's results from seven new holes (26-2654-05 to -07; 26-468-28, 26-3552-62, -63 and -64).” Open the release ↗ |
| 10 Nov 2026 | “First announced in Sept-2022, the discovery has 91 holes drilled (totalling 35,402m) and reported by Group Eleven to date, including today's results from twelve (12) previously released holes (reporting re-assayed Ge grades).” Open the release ↗ |
| 14 Oct 2026 | “The Company is fully funded for its ongoing drill campaign, totalling approx. 67,000m, started in April 2026 and aiming to complete at or around end of 2027.” Open the release ↗ |
| 20 Aug 2026 | “26-468-25 – First ever hole drilled at gravity 'Anomaly A' (approx. 2km to the SW of the currently outlined discovery limits), returned multiple intervals, intermittently throughout the hole, of trace malachite, chalcopyrite, suspected tennantite-tetrahedrite, sphalerite and galena, plus steeply south-dipping faults, suggesting the presence of a mineralizing system much further SW than previously known; above results are highly encouraging; follow up drilling planned in near term” Open the release ↗ |
| 23 Jul 2026 | “In the interim, we look forward to completing the current 2,700m drill campaign at Stonepark over the coming months.” Open the release ↗ |
| 7 Jul 2026 | “• 26-3552-55 – Representing first hole drilled at gravity-high anomaly 'D' , and implying a step-out distance of 265m from nearest drilling, returned numerous zones of weaker mineralization prospective for nearby massive sulphide mineralization; follow up drilling expected shortly” Open the release ↗ |
| 16 Apr 2026 | “A four-hole drill program totalling 2,700m is planned, comprising: one hole at the Stonepark deposit testing beneath known Zn-Pb mineralization for possible Cu mineralization; one hole at the Kilteely prospect; and two holes at or near the Bruff prospect.” Open the release ↗ |
| 25 Feb 2026 | “A third and final batch of results from this hole is pending and expected to be released over the coming weeks.” Open the release ↗ |