TSXV: SCOT · Gold

Scottie Resources Corp.

Scottie Resources Corp. is a TSX Venture gold explorer with 3 drilling campaigns on our Drill & Assay board: 1 drilling, 1 with results due, 1 planned and 0 finished. Its latest news release with drilling facts came out on 4 Nov 2026. Below: every drilling campaign the company has announced, where each stands today, each fact quoted from the company’s own news release.

Main commodity
Gold
from its releases and company profile
Campaigns
3
1 drilling · 1 results due · 1 planned · 0 finished
Rigs on site
1
the most any campaign states
Latest news release
4 Nov 2026
with drilling facts
TSXV code
SCOT
TSX Venture Exchange

Scottie Resources Corp. share price

Daily candles
Scottie Resources Corp. 12-month share-price chart (TradingView, daily candles).

The close at the top of this page is the TSX Venture closing price from our own nightly price record.

On today’s TSX/V boards

Reading today’s boards…

Latest investor presentation

No investor presentation found on the company’s website.

Drilling campaigns

As of 20 Nov 2026
#CampaignStatusLatest factUpdated
012026 drilling program at the Scottie Gold Mine Project
Scottie Gold Mine Project · 2026 · diamond
Results due227 holes drilled · 61,578 m drilled · over 50,000 m planned · 10–15 holes planned
“The 2026 drilling program at the Scottie Gold Mine Project has concluded, with 61,578 metres ("m") drilled across 227 holes and most of assay results still outstanding.”
news release
4 Nov 2026
02first-ever drilling at the Cambria Project
Cambria Project · diamond
Drilling2,000–3,000 m planned · 1 rig
“The first-ever drilling has commenced at the Cambria Project targeting 2,000 - 3,000 metres of drilling.”
news release
18 Aug 2026
03Scottie Gold Mine Project
diamond
Planned4–5 holes
“The 2026 program will include drilling at the Bend Vein, where 4 to 5 holes are planned to continue testing and expanding mineralized structures associated with this near-surface vein system.”
news release
26 May 2026

AnalyzeOre

Drilling news releases

AnalyzeOre reads a drilling or assay news release and shows what it says, what it leaves out, and the words each fact came from. It uses the release text on TMX Money, or the company’s own PDF, and links to the release; it does not copy it.

  • 4 Nov 2026The 2026 drilling program at the Scottie Gold Mine Project has concluded, with 61,578 metres ("m") drilled acr…
  • 28 Oct 2026Assays are expected throughout the remainder of 2026 and into early 2027.
  • 9 Sep 2026The resource does not include the 27,000 m of diamond drilling that was completed in the summer of 2025, nor t…
  • 18 Aug 2026Approximately 2,000 metres have now been drilled at the Domino target, about 2 km west of the Scottie Gold Min…
  • 26 May 2026Drilling at Domino will consist of 10 to 15 holes designed to test mapped vein structures, deeper geophysical…

Recent news releases

On TMX Money or the company’s own website
DateFact quoted
4 Nov 2026
“The 2026 drilling program at the Scottie Gold Mine Project has concluded, with 61,578 metres ("m") drilled across 227 holes and most of assay results still outstanding.”
Open the release ↗
28 Oct 2026
“Assays are expected throughout the remainder of 2026 and into early 2027.”
Open the release ↗
9 Sep 2026
“The resource does not include the 27,000 m of diamond drilling that was completed in the summer of 2025, nor the >50,000 m program currently underway on the Scottie Gold Mine Project.”
Open the release ↗
18 Aug 2026
“Approximately 2,000 metres have now been drilled at the Domino target, about 2 km west of the Scottie Gold Mine, where Scottie is aggressively testing numerous outcropping veins at surface coincident with IP anomalies and over 30 high-grade surface samples between 5 and 536 g/t Gold.”
Open the release ↗
26 May 2026
“Drilling at Domino will consist of 10 to 15 holes designed to test mapped vein structures, deeper geophysical targets, and areas of high-grade surface samples.”
Open the release ↗
26 May 2026
“The 2026 program will include drilling at the Bend Vein, where 4 to 5 holes are planned to continue testing and expanding mineralized structures associated with this near-surface vein system.”
Open the release ↗
Drilling facts as of 20 Nov 2026Built from news releases our Drill & Assay scan has already read. Market value is shown only when our stored share count agrees with the one TMX Money (the exchange’s own site) publishes, within 5%, and is left out otherwise; the 12-month move and the 52-week range are shown only when a full year of closing prices is stored. Peers and the Resourceful chat are for ASX companies only for now. AnalyzeOre reads this company’s news releases from the text on TMX Money, or from the company’s own PDF, and shows our own reading with a link to the release. Not financial advice.

Not financial advice. Catalyst Ahead is an AI-driven research tool. All projections are inferences from public company announcements. Always do your own research and consult a licensed adviser before trading.