TSXV: SAG

Sterling Metals Corp.

Sterling Metals Corp. is a TSX Venture explorer with 4 drilling campaigns on our Drill & Assay board: 2 drilling, 1 with results due, 0 planned and 1 finished. Its latest news release with drilling facts came out on 28 Oct 2026. Below: every drilling campaign the company has announced, where each stands today, each fact quoted from the company’s own news release.

Campaigns
4
2 drilling · 1 results due · 0 planned · 1 finished
Rigs on site
1
the most any campaign states
Latest news release
28 Oct 2026
with drilling facts
TSXV code
SAG
TSX Venture Exchange

Sterling Metals Corp. share price

Daily candles
Sterling Metals Corp. 12-month share-price chart (TradingView, daily candles).

The close at the top of this page is the TSX Venture closing price from our own nightly price record.

On today’s TSX/V boards

Reading today’s boards…

Latest investor presentation

No investor presentation found on the company’s website.

Drilling campaigns

As of 20 Nov 2026
#CampaignStatusLatest factUpdated
01initial drilling on a new eastern pad; first-pass program, approximately 850m east of MEPS
Soo Copper Project · diamond
Results due3 holes drilled
“The three holes reported here were drilled from the same new pad approximately 850m east of SC-26-16, the current eastern limit of the MEPS copper system.”
news release
28 Oct 2026
02ongoing drill program; 2026 program testing the MEPS porphyry copper system
Soo Copper Project · 2026 · diamond
Drilling53 holes drilled · over 22,000 m drilled · 1+ rigs
“Sterling has now completed 53 holes totalling more than 22,000m during the 2026 program, exceeding the Company's stated minimum 20,000m drill program.”
news release
5 Oct 2026
03expanded and completed 2025 drilling program
Soo Copper Project · 2025 · diamond
Finishedcompleted
“Sterling Metals Corp. (TSXV:SAG)(OTCQB:SAGGF) ("Sterling" or the "Company") is pleased to report the remaining assay results from its expanded and completed 2025 drilling program at the Soo Copper Project (" Soo Copper " or the " Project" ) located near Batchewana Bay, Ontario.”
news release
16 Mar 2026
042026 drill campaign
Soo Copper Project · 2026
Drilling20,000 m planned · 1+ rigs
“The program is planned for a minimum of 20,000 metres with the winter portion of the program aimed at testing the larger scale targets along strike and below the MEPS discovery area (Figure 1 and 2).”
news release
19 Feb 2026

AnalyzeOre

Drilling news releases

AnalyzeOre reads a drilling or assay news release and shows what it says, what it leaves out, and the words each fact came from. It uses the release text on TMX Money, or the company’s own PDF, and links to the release; it does not copy it.

  • 28 Oct 2026The three holes reported here were drilled from the same new pad approximately 850m east of SC-26-16, the curr…
  • 5 Oct 2026Sterling has now completed 53 holes totalling more than 22,000m during the 2026 program, exceeding the Company…
  • 16 Mar 2026Sterling Metals Corp. (TSXV:SAG)(OTCQB:SAGGF) ("Sterling" or the "Company") is pleased to report the remaining…
  • 1 Mar 2026While assays are not expected for some time, the evidence from this hole suggests this is not the core of the…
  • 19 Feb 2026The program is planned for a minimum of 20,000 metres with the winter portion of the program aimed at testing…

Recent news releases

On TMX Money or the company’s own website
DateFact quoted
28 Oct 2026
“The three holes reported here were drilled from the same new pad approximately 850m east of SC-26-16, the current eastern limit of the MEPS copper system.”
Open the release ↗
5 Oct 2026
“Sterling has now completed 53 holes totalling more than 22,000m during the 2026 program, exceeding the Company's stated minimum 20,000m drill program.”
Open the release ↗
16 Mar 2026
“Sterling Metals Corp. (TSXV:SAG)(OTCQB:SAGGF) ("Sterling" or the "Company") is pleased to report the remaining assay results from its expanded and completed 2025 drilling program at the Soo Copper Project (" Soo Copper " or the " Project" ) located near Batchewana Bay, Ontario.”
Open the release ↗
1 Mar 2026
“While assays are not expected for some time, the evidence from this hole suggests this is not the core of the mineralized stock but a peripheral part of a larger copper zone.”
Open the release ↗
19 Feb 2026
“The program is planned for a minimum of 20,000 metres with the winter portion of the program aimed at testing the larger scale targets along strike and below the MEPS discovery area (Figure 1 and 2).”
Open the release ↗
15 Jan 2026
“Results released today represent 17 of 33 drillholes (6,267m) completed in 2025, including four holes previously released, with assays pending for 12 additional holes from the central core of the system.”
Open the release ↗
Drilling facts as of 20 Nov 2026Built from news releases our Drill & Assay scan has already read. Market value is shown only when our stored share count agrees with the one TMX Money (the exchange’s own site) publishes, within 5%, and is left out otherwise; the 12-month move and the 52-week range are shown only when a full year of closing prices is stored. Peers and the Resourceful chat are for ASX companies only for now. AnalyzeOre reads this company’s news releases from the text on TMX Money, or from the company’s own PDF, and shows our own reading with a link to the release. Not financial advice.

Not financial advice. Catalyst Ahead is an AI-driven research tool. All projections are inferences from public company announcements. Always do your own research and consult a licensed adviser before trading.