Newcore Gold Ltd.
Newcore Gold Ltd. is a TSX Venture gold explorer with 4 drilling campaigns on our Drill & Assay board: 1 drilling, 3 with results due, 0 planned and 0 finished. Its latest news release with drilling facts came out on 28 Oct 2026. Below: every drilling campaign the company has announced, where each stands today, each fact quoted from the company’s own news release.
Newcore Gold Ltd. share price
The close at the top of this page is the TSX Venture closing price from our own nightly price record.
On today’s TSX/V boards
Reading today’s boards…
No investor presentation found on the company’s website.
Drilling campaigns
| # | Campaign | Status | Latest fact | Updated |
|---|---|---|---|---|
| 01 | Enchi Gold Project 80,000 metre drill program Enchi Gold Project · rc, diamond | Drilling | 323 holes drilled · 51,661 m drilled · 80,000 m planned · 1+ rigs “An 80,000 metre drill program is underway at Enchi.” news release | 28 Oct 2026 |
| 02 | RC Drilling at the Boin Gold Deposit Enchi Gold Project · rc | Results due | 24 holes drilled · 3,370 m drilled “KBRC373 to KBRC390 and KBRC405 to KBRC410 (24 RC holes totalling 3,370 m) were completed at Boin, targeting shallow mineralization within the northern portion of the deposit.” news release | 6 Oct 2026 |
| 03 | Diamond Drilling at the Sewum Gold Deposit Enchi Gold Project · diamond | Results due | 6 holes drilled · 2,069 m drilled “SWDD115 and SWDD117 to SWDD121 (6 DD holes totalling 2,069 m) were completed at Sewum, targeting mineralization within the shallow oxide-transition and the upper fresh mineral horizon at the Ridge Zone, with a goal of expanding the mineralized footprint of the deposit.” news release | 16 Jun 2026 |
| 04 | Diamond Drilling at the Boin Gold Deposit Enchi Gold Project · diamond | Results due | 10 holes drilled · 3,654 m drilled “KBDD106 to KBDD115A (10 DD holes totalling 3,654 m) were completed at Boin, targeting mineralization below the limits of the pits that constrain the Mineral Resource Estimate.” news release | 6 May 2026 |
AnalyzeOre
AnalyzeOre reads a drilling or assay news release and shows what it says, what it leaves out, and the words each fact came from. It uses the release text on TMX Money, or the company’s own PDF, and links to the release; it does not copy it.
- 28 Oct 2026An 80,000 metre drill program is underway at Enchi.
- 6 Oct 2026KBRC373 to KBRC390 and KBRC405 to KBRC410 (24 RC holes totalling 3,370 m) were completed at Boin, targeting sh…
- 16 Jun 2026SWDD115 and SWDD117 to SWDD121 (6 DD holes totalling 2,069 m) were completed at Sewum, targeting mineralizatio…
- 6 May 2026KBDD106 to KBDD115A (10 DD holes totalling 3,654 m) were completed at Boin, targeting mineralization below the…
Recent news releases
| Date | Fact quoted |
|---|---|
| 28 Oct 2026 | “An 80,000 metre drill program is underway at Enchi.” Open the release ↗ |
| 6 Oct 2026 | “KBRC373 to KBRC390 and KBRC405 to KBRC410 (24 RC holes totalling 3,370 m) were completed at Boin, targeting shallow mineralization within the northern portion of the deposit.” Open the release ↗ |
| 16 Jun 2026 | “SWDD115 and SWDD117 to SWDD121 (6 DD holes totalling 2,069 m) were completed at Sewum, targeting mineralization within the shallow oxide-transition and the upper fresh mineral horizon at the Ridge Zone, with a goal of expanding the mineralized footprint of the deposit.” Open the release ↗ |
| 6 May 2026 | “KBDD106 to KBDD115A (10 DD holes totalling 3,654 m) were completed at Boin, targeting mineralization below the limits of the pits that constrain the Mineral Resource Estimate.” Open the release ↗ |