TSXV: NAR · Gold

North Arrow Minerals Inc.

North Arrow Minerals Inc. is a TSX Venture gold explorer with 5 drilling campaigns on our Drill & Assay board: 0 drilling, 0 with results due, 1 planned and 3 finished. Its latest news release with drilling facts came out on 19 Nov 2026. Below: every drilling campaign the company has announced, where each stands today, each fact quoted from the company’s own news release.

Main commodity
Gold
from its releases and company profile
Campaigns
5
0 drilling · 0 results due · 1 planned · 3 finished
Latest news release
19 Nov 2026
with drilling facts
TSXV code
NAR
TSX Venture Exchange

North Arrow Minerals Inc. share price

Daily candles
North Arrow Minerals Inc. 12-month share-price chart (TradingView, daily candles).

The close at the top of this page is the TSX Venture closing price from our own nightly price record.

On today’s TSX/V boards

Reading today’s boards…

Latest investor presentation

No investor presentation found on the company’s website.

Drilling campaigns

As of 20 Nov 2026
#CampaignStatusLatest factUpdated
01Rotation 4
Kraaipan Gold Project · 2026 · rc
Finished16 holes drilled · 1,075 m drilled
“Five holes reported today complete the 14-hole Tlou program.”
news release
19 Nov 2026
02Rotation 3 regional reconnaissance RC drilling
Kraaipan Gold Project · rc
Finished44 holes drilled · 1,639 m drilled · 40 holes planned
“Rotation 3 drilling was completed in two tranches, from June 10 to 19 and from July 16 to August 3, and comprised 44 vertical RC holes totaling 1,639 m in 10 fences across five target areas (Figure 1).”
news release
8 Sep 2026
03Core Drilling Plan
Kraaipan Gold Project · diamond
Plannedplanned
“Core Drilling Plan will build on the results at Target AE and ongoing geological interpretation at Target's AF and A.”
news release
24 Aug 2026
04Rotation 2 RC drilling
Kraaipan Gold Project · rc
Finished14 holes
“Drilling was completed between April 14 th and April 29 th and comprised 14 completed angled RC holes totaling 719 m within 4 grids spaced along the interpreted 450 m of strike length at AF.”
news release
15 Jul 2026
05Phase 1
Kraaipan Gold Project · Phase 1 · rc
Not clear20 holes drilled · 1,103 m drilled · about 1,130 m planned · up to 20 holes planned
“20 RC holes totaling 1,103m completed, testing four high-priority grids along an interpreted ~700m NE–SW strike length.”
news release
16 Apr 2026

AnalyzeOre

Drilling news releases

AnalyzeOre reads a drilling or assay news release and shows what it says, what it leaves out, and the words each fact came from. It uses the release text on TMX Money, or the company’s own PDF, and links to the release; it does not copy it.

  • 19 Nov 2026Five holes reported today complete the 14-hole Tlou program.
  • 4 Nov 2026Sixteen RC holes totalling 1,075 m were completed during Rotation 4: 14 at Tlou (968 m) and 2 at Nkwe (107 m).
  • 8 Sep 2026The Company has also commenced Rotation 4 RC drilling at Target AE, a planned 15-hole program designed to test…
  • 24 Aug 2026Core Drilling Plan will build on the results at Target AE and ongoing geological interpretation at Target's AF…
  • 15 Jul 2026Drilling was completed between April 14 th and April 29 th and comprised 14 completed angled RC holes totaling…

Recent news releases

On TMX Money or the company’s own website
DateFact quoted
19 Nov 2026
“Five holes reported today complete the 14-hole Tlou program.”
Open the release ↗
4 Nov 2026
“Sixteen RC holes totalling 1,075 m were completed during Rotation 4: 14 at Tlou (968 m) and 2 at Nkwe (107 m).”
Open the release ↗
8 Sep 2026
“The Company has also commenced Rotation 4 RC drilling at Target AE, a planned 15-hole program designed to test the strike and down-dip continuity of the target across its interpreted 1,000 m strike length, as part of its US$2.86 million 2026 exploration program.”
Open the release ↗
24 Aug 2026
“Core Drilling Plan will build on the results at Target AE and ongoing geological interpretation at Target's AF and A.”
Open the release ↗
15 Jul 2026
“Drilling was completed between April 14 th and April 29 th and comprised 14 completed angled RC holes totaling 719 m within 4 grids spaced along the interpreted 450 m of strike length at AF.”
Open the release ↗
8 Jun 2026
“Between 40 and 60 shallow holes are planned to test the base of the Kalahari cover and the upper 5-10 m of bedrock.”
Open the release ↗
16 Apr 2026
“Assay results expected in Q2 2026.”
Open the release ↗
27 Feb 2026
“Rotation 1 RC drilling will focus on Target A, with up to 20 holes totaling approximately 1,130m planned to test four high-priority areas.”
Open the release ↗
Drilling facts as of 20 Nov 2026Built from news releases our Drill & Assay scan has already read. Market value is shown only when our stored share count agrees with the one TMX Money (the exchange’s own site) publishes, within 5%, and is left out otherwise; the 12-month move and the 52-week range are shown only when a full year of closing prices is stored. Peers and the Resourceful chat are for ASX companies only for now. AnalyzeOre reads this company’s news releases from the text on TMX Money, or from the company’s own PDF, and shows our own reading with a link to the release. Not financial advice.

Not financial advice. Catalyst Ahead is an AI-driven research tool. All projections are inferences from public company announcements. Always do your own research and consult a licensed adviser before trading.