Luca Mining Corp.
Luca Mining Corp. is a TSX Venture explorer with 8 drilling campaigns on our Drill & Assay board: 6 drilling, 0 with results due, 2 planned and 0 finished. Its latest news release with drilling facts came out on 29 Oct 2026. Below: every drilling campaign the company has announced, where each stands today, each fact quoted from the company’s own news release.
Luca Mining Corp. share price
The close at the top of this page is the TSX Venture closing price from our own nightly price record.
On today’s TSX/V boards
Reading today’s boards…
No investor presentation found on the company’s website.
Drilling campaigns
| # | Campaign | Status | Latest fact | Updated |
|---|---|---|---|---|
| 01 | renewed exploration program in this area Tahuehueto · diamond | Drilling | 7 holes drilled · 1,532 m drilled · 1+ rigs “Luca has completed seven diamond drillholes totalling 1,532 m as part of its renewed exploration program in this area.” news release | 29 Oct 2026 |
| 02 | exploration drilling El Barqueño Project | Planned | planned “Following closing, Luca plans to advance permitting to enable exploration drilling and development studies.” news release | 13 Oct 2026 |
| 03 | Phase 1 Campo Morado · Phase 1 · diamond | Drilling | 52 holes drilled · about 9,000 m drilled · 10,000 m planned · 1+ rigs “Exploration activity remained significant, with approximately 9,000 metres of diamond drilling completed at Campo Morado during Q2, including underground, surface and geotechnical drilling.” news release | 17 Aug 2026 |
| 04 | ongoing 2026 drilling program Tahuehueto · 2026 · diamond | Drilling | 54 holes drilled · 10,426 m drilled · 2 rigs “To date, Luca has completed 54 underground holes for 10,426 m and 25 surface holes for 4,599 m using "HQ", "NQ" and/or "BQ" sized diamond drill core (Creston, Perdido, El Rey and Santiago targets).” news release | 7 Jul 2026 |
| 05 | follow-up drill program Tahuehueto | Planned | planned “The fact DDH26-SU-15 and DDH26-SU-16 did not intersect the mineralized structure is interpreted to be related to previously identified dilatational jogs in the veins, these areas are related to nearby high-grade brecciated targets elsewhere on the Property, and a follow-up drill program to further delineate this priority target is now being designed and slated to be implemented before the end of the year” news release | 7 Jul 2026 |
| 06 | surface drillholes designed to confirm and expand existing mineral resources at the Reforma and El Rey deposits Campo Morado · diamond | Drilling | 68 holes drilled · 16,535 m drilled · 2 rigs “In addition, 16,535 m have been drilled from 68 surface drillholes at the Reforma, El Rey, Reforma Deeps, Hidalgo, Zapata, Estrella de Oro, and Naranjo targets using "HQ" and/or "PQ" sized diamond drill core.” news release | 23 Jun 2026 |
| 07 | follow-up drill program Campo Morado · diamond | Drilling | 6 holes drilled · 1+ rigs “Together, the six drillholes collared into Largo Norte this season have increased confidence in this area and expanded previously defined mineralization, which management believes will represent an important addition to the mineral endowment of the Campo Morado Mine.” news release | 28 Apr 2026 |
| 08 | Phase 2 Campo Morado · Phase 2 · diamond | Drilling | 1+ rigs “Drillhole CMRY-25-05 extended mineralization by more than 30 metres beyond the previously modeled deposit boundary , highlighting the potential to increase mineral resources through continued drilling.” news release | 30 Jan 2026 |
AnalyzeOre
AnalyzeOre reads a drilling or assay news release and shows what it says, what it leaves out, and the words each fact came from. It uses the release text on TMX Money, or the company’s own PDF, and links to the release; it does not copy it.
- 29 Oct 2026Luca has completed seven diamond drillholes totalling 1,532 m as part of its renewed exploration program in th…
- 13 Oct 2026Following closing, Luca plans to advance permitting to enable exploration drilling and development studies.
- 8 Sep 2026which we continue to uncover with additional Catorce assays pending and ongoing drilling across multiple targe…
- 17 Aug 2026Exploration activity remained significant, with approximately 9,000 metres of diamond drilling completed at Ca…
- 6 Aug 2026Surface drilling continues, with the current focus on Estrella de Oro and Naranjo in conjunction with on-going…
Recent news releases
| Date | Fact quoted |
|---|---|
| 29 Oct 2026 | “Luca has completed seven diamond drillholes totalling 1,532 m as part of its renewed exploration program in this area.” Open the release ↗ |
| 13 Oct 2026 | “Following closing, Luca plans to advance permitting to enable exploration drilling and development studies.” Open the release ↗ |
| 8 Sep 2026 | “which we continue to uncover with additional Catorce assays pending and ongoing drilling across multiple target areas.” Open the release ↗ |
| 17 Aug 2026 | “Exploration activity remained significant, with approximately 9,000 metres of diamond drilling completed at Campo Morado during Q2, including underground, surface and geotechnical drilling.” Open the release ↗ |
| 6 Aug 2026 | “Surface drilling continues, with the current focus on Estrella de Oro and Naranjo in conjunction with on-going underground drilling planned to target the A9, Muñeco, Bajo and Fish deposits, which all contribute to the 2026–2028 mine plans.” Open the release ↗ |
| 7 Jul 2026 | “To date, Luca has completed 54 underground holes for 10,426 m and 25 surface holes for 4,599 m using "HQ", "NQ" and/or "BQ" sized diamond drill core (Creston, Perdido, El Rey and Santiago targets).” Open the release ↗ |
| 23 Jun 2026 | “To date, 52 underground diamond drillholes totaling 12,035 m have been completed at the Campo Morado mine using "HQ" and/or "NQ" sized diamond drill core.” Open the release ↗ |
| 28 Apr 2026 | “Together, the six drillholes collared into Largo Norte this season have increased confidence in this area and expanded previously defined mineralization, which management believes will represent an important addition to the mineral endowment of the Campo Morado Mine.” Open the release ↗ |
| 30 Jan 2026 | “Drilling has also commenced at the Zapata target, where previously undrilled coincident gravity and geochemical anomalies have been identified.” Open the release ↗ |
| 12 Jan 2026 | “• 8,440 m of underground drilling completed to date as part of the 10,000-metre Phase 1 and Phase 2 near-mine expansion program” Open the release ↗ |