TomaGold Corporation
TomaGold Corporation is a TSX Venture explorer with 3 drilling campaigns on our Drill & Assay board: 0 drilling, 0 with results due, 1 planned and 1 finished. Its latest news release with drilling facts came out on 30 Sep 2026. Below: every drilling campaign the company has announced, where each stands today, each fact quoted from the company’s own news release.
TomaGold Corporation share price
The close at the top of this page is the TSX Venture closing price from our own nightly price record.
On today’s TSX/V boards
Reading today’s boards…
No investor presentation found on the company’s website.
Drilling campaigns
| # | Campaign | Status | Latest fact | Updated |
|---|---|---|---|---|
| 01 | Phase 2 Berrigan Mine project · Phase 2 | Finished | 5 holes “These 3 drill holes extensions are the final of a 5-hole program which has succeeded in " highlighting a thick extensive polymetallic hydrothermal system", extending the Berrigan Deep Zone for a strike length of 250 m and 400 m vertically with intersections to a vertical depth of nearly 900 m.” news release | 30 Sep 2026 |
| 02 | next phase of drilling at Berrigan Mine Berrigan Mine project | Planned | planned “Use the combined datasets to design the next phase of drilling at Berrigan Mine and across the broader Chibougamau property portfolio.” news release | 12 Aug 2026 |
| 03 | Phase 1 Berrigan Mine project · Phase 1 | Not clear | reported “Phase 1 drilling intersected the historical Berrigan Mine mineralization but also in two drill hole TOM-25-015 and Tom-25-014 intersected 5.08 ZnEq (1.19 g/t AuEq over 98.5 m including 23.20% ZnEq over 4.90 m from the new lower zone and 24.85% ZnEq (5.83 AuEq) over 2.1 m in the Berrigan zone and 13.68 ZnEq (3.17 g/t AuEq) over 1.4 m in the new lower zone respectively as previously reported by TomaGold.” news release | 29 May 2026 |
AnalyzeOre
AnalyzeOre reads a drilling or assay news release and shows what it says, what it leaves out, and the words each fact came from. It uses the release text on TMX Money, or the company’s own PDF, and links to the release; it does not copy it.
- 30 Sep 2026These 3 drill holes extensions are the final of a 5-hole program which has succeeded in " highlighting a thick…
- 12 Aug 2026we look forward to sharing results with shareholders as they become available in the coming weeks.
- 29 May 2026Phase 1 drilling intersected the historical Berrigan Mine mineralization but also in two drill hole TOM-25-015…
Recent news releases
| Date | Fact quoted |
|---|---|
| 30 Sep 2026 | “These 3 drill holes extensions are the final of a 5-hole program which has succeeded in " highlighting a thick extensive polymetallic hydrothermal system", extending the Berrigan Deep Zone for a strike length of 250 m and 400 m vertically with intersections to a vertical depth of nearly 900 m.” Open the release ↗ |
| 12 Aug 2026 | “we look forward to sharing results with shareholders as they become available in the coming weeks.” Open the release ↗ |
| 29 May 2026 | “Phase 1 drilling intersected the historical Berrigan Mine mineralization but also in two drill hole TOM-25-015 and Tom-25-014 intersected 5.08 ZnEq (1.19 g/t AuEq over 98.5 m including 23.20% ZnEq over 4.90 m from the new lower zone and 24.85% ZnEq (5.83 AuEq) over 2.1 m in the Berrigan zone and 13.68 ZnEq (3.17 g/t AuEq) over 1.4 m in the new lower zone respectively as previously reported by TomaGold.” Open the release ↗ |