A2 Gold Corp.
A2 Gold Corp. is a TSX Venture gold explorer with 2 drilling campaigns on our Drill & Assay board: 0 drilling, 2 with results due, 0 planned and 0 finished. Its latest news release with drilling facts came out on 4 Nov 2026. Below: every drilling campaign the company has announced, where each stands today, each fact quoted from the company’s own news release.
A2 Gold Corp. share price
The close at the top of this page is the TSX Venture closing price from our own nightly price record.
On today’s TSX/V boards
Reading today’s boards…
No investor presentation found on the company’s website.
Drilling campaigns
| # | Campaign | Status | Latest fact | Updated |
|---|---|---|---|---|
| 01 | initial RC drill program at Target Pente Eastside Gold-Silver Project · rc | Results due | 5 holes drilled · about 1,936 m drilled · about 3,700 m planned · about 8 holes planned “A total of five RC drill holes were completed for approximately 1,936 metres (Figure 1) .” news release | 4 Nov 2026 |
| 02 | initial reverse circulation (RC) drill program at the Taylor Silver-Gold Project Taylor Silver-Gold Project · rc | Results due | 5,000 m planned · 15 holes planned “The four holes reported in this release represent all holes for which assays have been received, reviewed, and validated through the Company’s quality assurance and quality control procedures as of the date of this release.” news release | 22 Sep 2026 |
AnalyzeOre
AnalyzeOre reads a drilling or assay news release and shows what it says, what it leaves out, and the words each fact came from. It uses the release text on TMX Money, or the company’s own PDF, and links to the release; it does not copy it.
- 4 Nov 2026A total of five RC drill holes were completed for approximately 1,936 metres (Figure 1) .
- 28 Sep 2026Following finalization of drill targeting and hole design, the current program is expected to consist of appro…
- 22 Sep 2026The four holes reported in this release represent all holes for which assays have been received, reviewed, and…
- 6 Jul 2026The initial Taylor drill program consisting of 16-18 Reverse Circulation (“ RC ”) holes for a total of 5,000 m…
Recent news releases
| Date | Fact quoted |
|---|---|
| 4 Nov 2026 | “A total of five RC drill holes were completed for approximately 1,936 metres (Figure 1) .” Open the release ↗ |
| 28 Sep 2026 | “Following finalization of drill targeting and hole design, the current program is expected to consist of approximately 8 RC drill holes totaling 3,700 metres.” Open the release ↗ |
| 22 Sep 2026 | “The four holes reported in this release represent all holes for which assays have been received, reviewed, and validated through the Company’s quality assurance and quality control procedures as of the date of this release.” Open the release ↗ |
| 6 Jul 2026 | “The initial Taylor drill program consisting of 16-18 Reverse Circulation (“ RC ”) holes for a total of 5,000 metres (see Map 2) is designed to advance three principal objectives:” Open the release ↗ |