Aurania Resources Ltd.
Aurania Resources Ltd. is a TSX Venture gold explorer with 1 drilling campaign on our Drill & Assay board: 0 drilling, 1 with results due, 0 planned and 0 finished. Its latest news release with drilling facts came out on 16 Nov 2026. Below: every drilling campaign the company has announced, where each stands today, each fact quoted from the company’s own news release.
Aurania Resources Ltd. share price
The close at the top of this page is the TSX Venture closing price from our own nightly price record.
On today’s TSX/V boards
Reading today’s boards…
No investor presentation found on the company’s website.
Drilling campaigns
| # | Campaign | Status | Latest fact | Updated |
|---|---|---|---|---|
| 01 | 2026 drill program Thormódsdalur · 2026 · diamond Partner drilling “The Thormódsdalur project is located approximately 20 kilometres east of Reykjavík, Iceland, and is held by Iceland Resources ehf ("IR"), a wholly owned subsidiary of St-Georges Eco-Mining Corp. ("St-Georges") (CSE: SX).” The company’s words, 16 Nov 2026 news release | Results due | 8 holes drilled · 780.7 m drilled · about 770 m planned · 6 holes planned “Aurania completed eight diamond drill holes totalling 780.70 metres during the program.” news release | 16 Nov 2026 |
AnalyzeOre
AnalyzeOre reads a drilling or assay news release and shows what it says, what it leaves out, and the words each fact came from. It uses the release text on TMX Money, or the company’s own PDF, and links to the release; it does not copy it.
- 16 Nov 2026Aurania completed eight diamond drill holes totalling 780.70 metres during the program.
- 13 Oct 2026Eight holes were diamond drilled for a total of 780.70 metres, with mineralized textures consistent with epith…
- 8 Sep 2026Aurania has engaged a Finland-based drilling contractor – Arctic Drilling Company Oy Ltd – to carry out the pr…
Recent news releases
| Date | Fact quoted |
|---|---|
| 16 Nov 2026 | “Aurania completed eight diamond drill holes totalling 780.70 metres during the program.” Open the release ↗ |
| 13 Oct 2026 | “Eight holes were diamond drilled for a total of 780.70 metres, with mineralized textures consistent with epithermal gold-silver mineralization observed in every hole.” Open the release ↗ |
| 8 Sep 2026 | “Aurania has engaged a Finland-based drilling contractor – Arctic Drilling Company Oy Ltd – to carry out the program to diamond drill six holes for a total of approximately 770 metres at Thor’s Valley.” Open the release ↗ |